1.Open the package to check if the machine is intact and all the necessary accessories are completed.
2.Open the injection port to feed cooling water. (Do not spill out the water!)
3.Connect the water inlet and outlet pipe well according to system conditions
4.Plug in power, turn on the power switch. (Do not start up without water in the water tank!)
5.Check the water level in the water tank.
The video about installation of chiller:http://Article/HowtoinstallSAindust_1.html
CONTACT S&A
TEL:+86-20-89301885,
FAX:+86-20-84309967
SKYPE: teyuchiller
Email:
Website: http://
Rubber Tube,Wheelbarrow Inner Tube,Rubber Tubes
Inner tube and Flap,Motorcycle Tyre Co., Ltd. , http://www.chinamotorcyclewheel.com
没有评论:
发表评论