The installation of S&A industrial chiller

1.Open the package to check if the machine is intact and all the necessary accessories are completed.

chiller
2.Open the injection port to feed cooling water. (Do not spill out the water!)
chiller
3.Connect the water inlet and outlet pipe well according to system conditions
chiller
4.Plug in power, turn on the power switch. (Do not start up without water in the water tank!)
chiller
5.Check the water level in the water tank.
The video about installation of chiller:http://Article/HowtoinstallSAindust_1.html