2019年10月30日星期三

On the small concrete pump installation requirements and commissioning

Small concrete pump installation for many construction workers is quite common. However, in order to better install small concrete pump, which does require some technology. How to install a small concrete pump is better? Please go with Xiaobian take a look! About small concrete pump installation requirements and commissioning When installing concrete pump users must consider the source of concrete. If it is commercial concrete, mixing truck feed, pump can be installed locally, this time as long as the convenience of taking over and feeding can be. In the case of on-site mixing of concrete, the location of the mixer needs to be determined according to the site and the method of feeding the mixer. The position of the concrete pump is then determined according to the discharge height of the mixer and the requirements for pumping and taking over. For the scene of the mixing situation, the general will have the following requirements: 1, placing requirements Before installing the concrete pump, the concrete pump first placed on a solid concrete floor or stone pier, which will ensure that the concrete pump to maintain the level, At the same time the pump can be four legs positioning pin and safety pin locking, the tire off the ground or remove the tire. 2, chute installation According to the mixer's discharge port and the pump hopper to make a chute, the mixer unloading material through the chute into the pump hopper. It should be pointed out that the chute is usually made of angle steel and welded with 1.5 mm thick steel plate. Below the chute is usually supported by a stand to make it firm. 3, hopper installation Under normal circumstances, the pump hopper need to increase about 20 cm, so that the hopper can effectively increase the volume to ensure that concrete will not drain. It should be noted that the forced mixer discharge is best done at once, so that the concrete flowing into the hopper will be more uniform. If you carry out sub-discharge, the last of the concrete will be more concrete jib, pumping quite adverse, especially when the slump of concrete larger, more worthy of attention, so at this time asking price pump hopper. If it is a large capacity blender, then a storage hopper can be made in advance to ensure continuous feeding. 4, the overall requirements. Usually when placing the chute, be sure to properly request the slope, it is recommended that the best angle of inclination between 25 ° -40 °, the gap should not be too large. In addition, the chute and the pump hopper connection, the chute and the hopper to leave some space for easy cleaning hopper and sieve. After the overall installation of concrete pump in place, look at the whole, to ensure that the pump housing door can switch freely, easy maintenance. (Editor: Huang Nengwen QQ:)

Acetylene Gas

Acetylene Gas,High Purity Acetylene Gas,Seamless Steel Acetylene Gas,High Pure Grade Acetylene Gas

shizuishan pengsheng chemical co.,ltd , https://www.szspschem.com

没有评论:

发表评论